Project: |
Extension of the Trais-Münzenberg elevated tank |
Client: |
Münzenberg Corporation |
Construction period: |
2002-2003 |
Volume: |
400,000 euros total construction cost |
Performances: |
Engineering survey Performance Phases 1-8 in accordance with HOAI Local construction supervision Preparation of subsidy applications |
Special aspects: |
The existing tank no longer possessed sufficient capacity. A 120-metre long connecting pipe from the pump station to the water-supply system´s pressure downpipe was planned. The elevated tank was extendet by around 450 cbm without interruption to operations. |