Project details Münzenberg Elevated Tank

Project:
Extension of the Trais-Münzenberg elevated tank
Client:
Münzenberg Corporation
Construction period:
2002-2003
Volume:
400,000 euros total construction cost
Performances:
Engineering survey
Performance Phases 1-8 in accordance with HOAI
Local construction supervision
Preparation of subsidy applications
Special aspects:
The existing tank no longer possessed sufficient capacity. A 120-metre long connecting pipe from the pump station to the water-supply system´s pressure downpipe was planned. The elevated tank was extendet by around 450 cbm without interruption to operations.