Project details Marburg: two roundabouts

Project:
Construction of two roundabouts on the B3 and construction of a cycle path linking Bernsdorf and Schönstadt.
Client: Marburg Department of Roads and Transportation
Construction period: 2008
Volume:
1.1 million euros total construction cost
Performances: Performance Phases 3 and 5 in accordance with HOAI
Special aspects:
Two light-signal-controlled junctions (distance approx. 300 m) were replaced by roundabouts with the aim of improving performance and safety. A cycle path was also installed on one side of the B3. As it was necessary to utilise retentation space, surveys into compensating the losses needed to be carried out.