Project: |
Construction of stairs at Hofheim, Breckenheimer Straße |
Client: | Hofheim Municipal Utilities |
Construction period: | 2007 |
Volume: |
Around 0.35 million euros total construction cost |
Performances: | Performance Phases 1-8 in accordance with HOAI and local construction supervision |
Special aspects: | The run-down stairs were in need of repair. Execution included the renewal of all ductwork (drainage, water, power, gas, telecom) within the works. |