Project details Hofheim Junction

Project:
Hofheim, Schmelzweg / Zeilsheimer Straße junction
Client:
Hofheim Corporation
Construction period:
Volume:
0.7 million euros total construction cost
Performances: Performance Phases 1-8 in accordance with HOAI
Local construction supervision
Engineering survey
Performance capacity documentation
Coordination of cable runs
Special aspects:
Performance capacity surveys were used to determine the optimum junction design with the required dimensions. The work on the junction was carried out on the basis traffic loads for Hofheim Corporation in cooperation of the municipality of Kriftel.