Project: |
Hofheim, Schmelzweg / Zeilsheimer Straße junction |
Client: |
Hofheim Corporation |
Construction period: | |
Volume: |
0.7 million euros total construction cost |
Performances: | Performance Phases 1-8 in accordance with HOAI Local construction supervision Engineering survey Performance capacity documentation Coordination of cable runs |
Special aspects: |
Performance capacity surveys were used to determine the optimum junction design with the required dimensions. The work on the junction was carried out on the basis traffic loads for Hofheim Corporation in cooperation of the municipality of Kriftel. |