Project: |
Gunzenau main through-road |
Client: | Schotten Department of Roads and Transportation / Freiensteinau Municipality |
Construction period: | 2006-2007 |
Volume: |
Around 1.5 million euros total construction cost |
Performances: |
Execution planning. Performance Phases 5 and 6 in accordance with HOAI for roads. Performance Phases 1-8 in accordance with HOAI and local construction supervision for drainage and water. |
Special aspects: |
The Gunzenau main through-road was renewed along a stretch of around 1.9 km. Subsequent to a feasibility study, the drainage and water supply systems were also renewed at the same time. |