Project details Gunzenau Main Through-road

Project:
Gunzenau main through-road
Client: Schotten Department of Roads and Transportation / Freiensteinau Municipality
Construction period: 2006-2007
Volume:
Around 1.5 million euros total construction cost
Performances:
Execution planning.
Performance Phases 5 and 6 in accordance with HOAI for roads.
Performance Phases 1-8 in accordance with HOAI and local construction supervision for drainage and water.
Special aspects:
The Gunzenau main through-road was renewed along a stretch of around 1.9 km.
Subsequent to a feasibility study, the drainage and water supply systems were also renewed at the same time.