Project details Gießen Licher Straße

Project:
Gießen Licher Straße
Client:
Gießen Corporation
Construction period:
03/2009 - 11/2011
Volume:
8.3 million euros total construction cost
Performances:
Performance Phases 1-7 in accordance with HOAI
Local construction supervision
Special performances
Special aspects:
Design and execution planning within the framework of an economic stimulus package was completed in nine months.
A rail thrust bore with a diameter of 1.60 metres (clear) was carried out while rail traffic continued overhead.