Project:
|
Cycle path planning between Ehlhalten and Vockenhausen
|
Client:
|
Frankfurt Department of Roads and Transportation
|
Construction period:
|
2004 |
Volume:
|
1.9 million euros total construction cost
|
Performances:
|
Performance Phases 1-3, 5-6 and Performance Phases 1, 5-6 accompanying landscaping measures in accordance with HOAI
|
Special aspects:
|
The already existing permit planning needed to be digitised and adapted on the basis of a new survey. Here, it became necessary to replace the embankments with to a large extent nature-proximate gabion walls as the cycle path directly bordered a conservation ares. Guide walls and holes for amphibians hat to be built along the entire length.
|