Project details Angenrod B 62

Project:
Extension of the B62 between Angenrod and Ober-Gleen
Client:
Schotten Department of Roads and Transportation
Construction period:
2002-2008
Volume:
6.3 million euros total construction cost
Performanes:
Performance Phases 1-5 in accordance with HOAI
Overall ductwork plan
Construction phase plan
Special aspects:
The measure was realised in three construction phases.
For the 1st phase, the existing permit planning was digitesed and developed into a construction plan.
For the 2nd and 3rd construction phases, all performances up to and including the construction plan were provided.