Project detail Fritz Winter Duct Renewal

Project:
Duct renewal during on-going operations
Client:
Fritz Winter, Stadtallendorf
Construction period:
2007-2011
Volume:

Performances:
Performances Phases 3-8 in accordance with HOAI
Local construction supervision
Feasibility studies
Special aspects:
The sewer network on the premises of the Fritz Winter foundry was digitally documented for the first time and processed in a database. The condition of the sewers was determined and a renewal concept drawn up and implemented.
The continued operation of the systems constituted a special aspect of the work.