Project: |
Duct renewal during on-going operations |
Client: |
Fritz Winter, Stadtallendorf |
Construction period: |
2007-2011 |
Volume: |
|
Performances: |
Performances Phases 3-8 in accordance with HOAI Local construction supervision Feasibility studies |
Special aspects: |
The sewer network on the premises of the Fritz Winter foundry was digitally documented for the first time and processed in a database. The condition of the sewers was determined and a renewal concept drawn up and implemented. The continued operation of the systems constituted a special aspect of the work. |