Project details Waste water pump station

Project:
Combined waste water pump station and rain overflow basin, Mücke-Bernsfeld
Client:
Ohm-Seenbach Department of Roads and Transportation
Construction period:
2002-2003
Volume:
Around 0.5 million euros total construction cost
Performances:
Performance Phases 1-9 in accordance with HOAI
Engineering survey
Asbuilt documentation
Special aspects:
An overflow basin with downstream round basin possessing a capacity of 265 cbm was built from whith the waste water is slowed down and forwarded with the help of a dry-standing pump station. A stilling basin with a capacity of around 1,000 cbm was installed in front of the drain to protect the receiving water facility.