Project: |
Combined waste water pump station and rain overflow basin, Mücke-Bernsfeld |
Client: |
Ohm-Seenbach Department of Roads and Transportation |
Construction period: |
2002-2003 |
Volume: |
Around 0.5 million euros total construction cost |
Performances: |
Performance Phases 1-9 in accordance with HOAI Engineering survey Asbuilt documentation |
Special aspects: |
An overflow basin with downstream round basin possessing a capacity of 265 cbm was built from whith the waste water is slowed down and forwarded with the help of a dry-standing pump station. A stilling basin with a capacity of around 1,000 cbm was installed in front of the drain to protect the receiving water facility. |