Project details Ebsdorf Duct Renewal

Project:
Kalibersten saves gardens
Client:
Municipality of Ebsdorfergrund
Construction period:
2005-2009
Volume:

Performances:
Performance Phases 3-8 in accordance with HOAI
Local construction supervision
Feasibility studies
Besonderheiten:
The results from the self-checking ordinance for sewer ducts in all districts were analysed. A renewal concept was then drawn up. This renewal concept was subsequently implemented in phases in the districts so that all damage requiring quick and immediate measures was repaired. It was possible to repair most of the damage using robots; some damage, however, had to be conventionally repaired by opening up the sites.