Project: |
Construction of rainwater retention basins within the scope of extension work on the B 62 near Angenrod |
Client: |
Schotten Department of Roads and Transportation |
Construction period: |
2007-2008 |
Volume: |
0.45 million euros total construction cost |
Performances: |
Performance Phases 1-5 in accordance with HOAI |
Special aspects: |
A rainwater retention basin with upstream treatment was planned for the purposes of slowing down the surface water running off the extended B 62. |