Project details Angenrod

Project:
Construction of rainwater retention basins within the scope of extension work on the B 62 near Angenrod
Client:
Schotten Department of Roads and Transportation
Construction period:
2007-2008
Volume:
0.45 million euros total construction cost
Performances:
Performance Phases 1-5 in accordance with HOAI
Special aspects:
A rainwater retention basin with upstream treatment was planned for the purposes of slowing down the surface water running off the extended B 62.